In the Township of Southgate, Ontario, connection mandatory: False; billing basis: metered; connection mandatory: True; billing basis: metered. Source: Municipal Waterworks Supply System By-law 12-2011; Sewer Use By-law 2021-090; Water and Wastewater Rate By-law 2026-006, verified 2026-06-09.
Municipal Waterworks Supply System By-law 12-2011
adopted bylaw
connection mandatory
False
s. 3.1 "An owner may apply for a water service"
billing basis
metered
s. 7.1 "All water used on premises within the Township...shall pass through the meter"
scout note
Regulates the municipal waterworks supply system and connected premises in Southgate.
Sewer Use By-law 2021-090
adopted bylaw
connection mandatory
True
s. 2.1
scout note
Regulates municipal sanitary and storm sewage systems and connected premises.
Water and Wastewater Rate By-law 2026-006
adopted bylaw
billing basis
metered
Monthly Base Charge by Meter Size
scout note
Establishes water and wastewater service rates for lands and premises connected to municipal water mains and sanitary sewers.